Day 1 - Site Cut

Site Cut Success!
Site was cut on North side of site to approx 600mm, with a slight fill on South side. Site doesn't look 753m2 - looks smaller.
I will be constructing a retaining wall along the North side cut/fence line from 2400x75x200 treated pine sleepers using custom made 'H', 'C' and '90Deg' posts, manufactured by my father-in-law and custom powder coated in Monument too! It will be lined with geo-fabric and drained with agi-pipe & scoria. Agi-pipe will be eventually join up to 4 silt pits which will be connected to storm water.

View towards NNE (Rear)

 Looking towards SW corner (Front)

Garage location in foreground

Retaining wall location on North side fence