After talking to the builder also, it seems that the site set-out was completed, concrete piers were bored, plumbing trenching and rough-in was done and electrical meter box placed in-situ as well.
Was very impressed to learn that plumber has decided to plumb a separate 90mm storm water drain which connects to 3x silt pits only, which I will be connecting my agi-drains from the retaining wall to.
Plumbing set-out
Meter Box & silt pit
another silt pit.
note seperate 90mm storm water on LHS!
note seperate 90mm storm water on LHS!
All filled in
All filled in
All filled in
All filled in