I met up with electrician on-site this morning and handed over my amended electrical plan and we went through it in detail over the next 1.5hrs. I also brought along some of the supplied lighting/sensors I will be getting him to install. Basically, we are supplying all the light fittings except the downlights. I was going to supply these but he doesn't want to use 12v ones I was going to supply. He uses the 240v type. We are also supplying 18x GPOs, which I acquired from my brother-in-law which will be used downstairs only. I will be changing over, after handover, the switches downstairs to Clipsal Saturn Push-button LED type in Ocean Mist.