After 6 years, 2 sites and 3 sets of final drawings for 'dream' homes, we have finally decided on the NBG Buckingham 320E with an altered floorplan which includes a Triple Garage and a walk in pantry, to name a few alterations!
A lovely location but we have to knockdown original dwelling first!
HANDOVER SORTED - 1 year and 1 day!
Day 16 - Concrete poured
(Mon 14/11)
Concreter poured the concrete. Aggregate to be exposed tomorrow.
No comments:
Post a Comment