HANDOVER SORTED - 1 year and 1 day!

Day 51 - Framing cont....

Framing of Ground floor looks complete. The Brickies now have the job of bricking up the garage before work can continue on the framing.
Builder has called to discuss a design fault. The Entry door is 2340mm in height and the entry area has a dropped ceiling feature. As you would imagine, this will not work, as the ceiling height is 2550mm and to drop it down at edges will come down below the door height. A good pick up on his part but it leaves us with some choices to chew on over the Christmas break. I think we will just have square set plaster in entry area and have a couple of cut-outs features on the LHS as you enter from front door.
Any suggestions would be greatly appreciated!
Brickies were due to start this week (Mon 20/12) but heavy rains over the weekend have hampered their enthusiasm I would expect! Maybe this is it before Christmas.


Guest Bedroom


Portico


Garage area

No comments:

Post a Comment