After 6 years, 2 sites and 3 sets of final drawings for 'dream' homes, we have finally decided on the NBG Buckingham 320E with an altered floorplan which includes a Triple Garage and a walk in pantry, to name a few alterations!
A lovely location but we have to knockdown original dwelling first!
HANDOVER SORTED - 1 year and 1 day!
Day 85 - Floor joists done
All LVLs & most of the I-Beam Floor joists were installed today, ready for the Yellow Tongue flooring for upstairs to be started tomorrow.
Inside Garage
Kitchen Roof
Alfresco from rear propped up
with temporary 4x4 posts