HANDOVER SORTED - 1 year and 1 day!

Day 92 - First Floor Framing cont....

Upstairs framing continued today. Expecting the trusses and windows tomorrow (29/1) or early next week.
We have asked for a few minor changes, even at this stage! My wife wants a door between the Master (Bed 1 on plans) and the WIR. see image below
I have also decided to keep the ducted vacuum system downstairs only and have added a Vacusweep in the Kitchen and another outlet. see image below
My wife has asked for another window in the Meals to be quoted! Bear in mind the windows are to be delivered next week! I would imagine, this would come at a cost, assuming it can be done. I worked out if it can be done, that is would be a 610mmx1800mm Armadale Awning window, the same as the ones in the Living, except narrower.
The builder was fine about these items and has suggested an 870mm wide single door for the Master to WIR door. We will go with what he has suggested, assuming it's not too expensive.







 Red indicates 870mm wide door
(not double door as shown)

 
Vacusweep for Kitchen now added


 
 Red indicates 610mm x 1800mm additional window?
(If possible and affordable!)